Black Dog Long-Line Lead 4.8m

Ultimate Control for Training & Recall

$63.00
In Stock
Auto Delivery Save $ every order

Shop Now Pay Later with Afterpay

Make 4 payments of $15.75 over 8 weeks.

Shop Now Pay Later with Zip

Own it now, pay later with Zip.


30 Day Returns
Secure Checkout
Australian Owned & Operated
Family Business
Fast Shipping
5,000+ Five Star Reviews

Black Dog Long-Line Lead 4.8m – Ultimate Control for Training & Recall

The Black Dog Long-Line Lead (4.8m) is a must-have training tool for building reliable recall, promoting freedom with safety, and reinforcing obedience in open spaces. Designed specifically for training purposes, this extra-long lead gives your dog room to explore while still keeping you in control — perfect for parks, beaches, or large yards.

Crafted from high-quality webbing, this 4.8-metre lead is lightweight yet durable, offering the ideal balance of comfort and strength for handlers and dogs alike. It’s a great solution for dogs learning to come when called, working on their off-lead manners, or practising in high-distraction environments.

Key Features:

  • Extra Length for Freedom & Safety: Gives your dog space to roam while staying safely connected to you.
  • Perfect for Recall Training: Ideal for teaching dogs to return when called, even from a distance.
  • Strong, Durable Design: Made from premium-grade webbing that stands up to daily use.
  • Lightweight & Comfortable: Easy to handle and doesn’t weigh down your dog.
  • Tangle-Reducing Simplicity: No handles or loops to snag on the ground, allowing for smoother trailing and reduced tangling risk.

Specifications:

  • Length: 4.8 metres

  • Material: Durable nylon webbing

  • Colour: Black

  • Style: No-handle trailing design for safety and ease of use

Whether you're training a young pup, working on obedience with an adult dog, or simply want added security in open spaces, the Black Dog Long-Line Lead 4.8m is a reliable tool for confident and controlled adventures.

(LLReg-Blk)

SKULLReg-Blk
Brand BlackDog
Shipping Weight0.2000kg

Write a product review

Misleading

By: Express on 5 February 2021
Love the long lead, but packaging on lead said 5 metres and lead is definitely not that length. Is more like 2 metres in length.
(3)

black dog 4.8 long lead black

By: Express on 25 November 2017
great product very prompt delivery. very happy
(5)

Dog lead

By: Express on 8 April 2017
Very happy with quality service & product.
(5)

Others Also Bought


RRP $16.95
Soft Nylon Padded Collar 3/4" wide

Soft Nylon Padded Collar 3/4" wide

2 Reviews

From$13.97

More Information

Add to Wishlist

Which option would you like to save?

Prestige Soft Padded Collar 3/4" X 14" Black (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Burgundy (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Gold (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Hot Pink (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Hunter Green (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Navy (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Purple (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Red (36Cm)
Prestige Soft Padded Collar 3/4" X 14" Turquoise (36Cm)
Prestige Soft Padded Collar 3/4" X 16" Black (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Burgundy (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Gold (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Hot Pink (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Hunter Green (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Navy (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Purple (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Red (41Cm)
Prestige Soft Padded Collar 3/4" X 16" Turquoise (41Cm)
Prestige Soft Padded Collar 3/4" X 18" Black (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Burgundy (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Gold (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Hot Pink (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Hunter Green (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Navy (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Purple (46Cm)
Prestige Soft Padded Collar 3/4" X 18" Red (46Cm)
Prestige Soft Padded Collar 3/4" X 20" Black (51Cm)
Prestige Soft Padded Collar 3/4" X 20" Burgundy (51Cm)
Prestige Soft Padded Collar 3/4" X 20" Hot Pink (51Cm)
Prestige Soft Padded Collar 3/4" X 20" Hunter Green (51Cm)
Prestige Soft Padded Collar 3/4" X 20" Navy (51Cm)
Prestige Soft Padded Collar 3/4" X 20" Purple (51Cm)
Prestige Soft Padded Collar 3/4" X 20" Turquoise (51Cm)
Soft Nylon Padded Collar 3/4" wide - Blue 16" (41cm)
Soft Nylon Padded Collar 3/4" wide - Turquoise 18" (46cm)
Soft Nylon Padded Collar 3/4" wide Rainbow
Tap the heart beside the option you want to save.
33% OFFRRP $45.99
Flat Nylon Dog Recall Lead Black (1" X 7M Long)
27% OFFRRP $17.35
Birdie Rainbow Bridge Block Toy 36x20cm
RRP $59.99
Rogz AirTech Classic Lead for Dogs

Rogz AirTech Classic Lead for Dogs

From$33.51

More Information

Add to Wishlist

Which option would you like to save?

Rogz AirTech Classic Lead - Large (Platinum Grey)
Rogz AirTech Lead for Dogs - Large (Sunset Pink)
Rogz AirTech Lead for Dogs - Medium (Burnt Orche)
Rogz AirTech Lead for Dogs - Medium (Platinum Grey)
Rogz AirTech Lead for Dogs - Medium (Sunset Pink)
Tap the heart beside the option you want to save.

More From This Category


RRP $65.99
BlackDog Training Halter

BlackDog Training Halter

9 Reviews

From$41.15

More Information

Add to Wishlist

Which option would you like to save?

BlackDog Training Halter - Mini Pink
BlackDog Training Halter - Mini Black
BlackDog Training Halter - Mini Purple
BlackDog Training Halter - Mini Blue
BlackDog Training Halter - Mini Red
BlackDog Training Halter - Small Black
BlackDog Training Halter - Small Blue
BlackDog Training Halter - Small Pink
BlackDog Training Halter - Small Red
BlackDog Training Halter - Medium Black
BlackDog Training Halter - Medium Purple
BlackDog Training Halter - Medium Blue
Black Dog Training Halter - Medium Red
BlackDog Training Halter - Medium Pink
BlackDog Training Halter - Large Black
BlackDog Training Halter - Large Blue
BlackDog Training Halter - Large Red
BlackDog Training Halter - Large Pink
BlackDog Training Halter - Large Purple
BlackDog Training Halter - XLarge Black
BlackDog Training Halter - XLarge Red
BlackDog Training Halter - Xlarge Pink
CLEARANCE | BlackDog Training Halter - XLarge Blue
CLEARANCE | BlackDog Training Halter - XLarge Purple
Tap the heart beside the option you want to save.
33% OFFRRP $45.99
Flat Nylon Dog Recall Lead Black (1" X 7M Long)
Black Dog Long-Line Lead 4.8m

Black Dog Long-Line Lead 4.8m

3 Reviews

$63.00

38% OFFRRP $74.99
BlackDog Double Ended Regular Lead 2.2m x 25mm BLACK
RRP $65.99
BlackDog Haltermate Black

BlackDog Haltermate Black

From$40.38

See Auto Delivery Options

Add to Wishlist

Which option would you like to save?

BlackDog Haltermate [Size: 1] Black
BlackDog Haltermate [Size: 2] Black
BlackDog Haltermate [Size: 3] Black
BlackDog Haltermate [Size: 4] Black
Tap the heart beside the option you want to save.
BlackDog HalterMate Blue

BlackDog HalterMate Blue

From$40.38

More Information

Add to Wishlist

Which option would you like to save?

BlackDog HalterMate BLUE [Size : 1]
BlackDog HalterMate BLUE [Size : 2]
BlackDog HalterMate BLUE [Size : 3]
BlackDog HalterMate BLUE [Size : 4]
Tap the heart beside the option you want to save.
19% OFFRRP $65.99
Black Dog Training Halter - Large Purple